Vertiv stories
HP has appointed Multimedia Technology as its Tier-1 distributor for Z workstations and AI solutions across Australia, enhancing SMB access to advanced computing.
Interactive launches Power Assurance to support critical power infrastructure across Australia and New Zealand, enhancing uptime and business continuity.
Vertiv launches PowerIT rack PDUs up to 57.6 kW to meet rising AI data centre power demands across EMEA, North America and beyond.
Vertiv has acquired Belgian software firm Waylay to enhance AI-driven monitoring and analytics for power and cooling in global data centres.
Vertiv has completed its USD $200 million acquisition of Great Lakes, enhancing its data centre rack and cabinet solutions for AI and edge computing needs.
Vertiv launches OneCore, a scalable, prefabricated infrastructure system to speed up high-density data centre deployment globally for AI and HPC.
Vertiv is set to acquire Great Lakes Data Racks for USD $200 million, enhancing its AI-ready infrastructure solutions in the data centre sector.
Vertiv appointed Mike Giresi as global CIO from 30 June 2025 to drive AI adoption, cybersecurity, and digital productivity across its worldwide operations.
Vertiv launches a 142kW cooling and power design for NVIDIA GB300, boosting AI data centre efficiency with digital simulation and Adaptable cooling.
Vertiv has opened its new Sydney HQ with the first Customer Experience Centre in Australia, enhancing support for the nation's growing digital economy.
Vertiv launches SmartRun, a modular IT infrastructure system that speeds up AI data centre deployment by 85%, integrating power, cooling, and containment.
Vertiv has unveiled the CoolLoop Trim Cooler in Australia, a cutting-edge system aimed at optimising energy efficiency for AI and high-performance computing.
Vertiv has launched the new PowerDirect Rack, a cutting-edge DC power solution designed for AI and high-performance computing, enhancing data centre efficiency.
Vertiv has announced a partnership with Collaborate IT through an Authorised Service Partner Program for the UK and Ireland, boosting IT management capabilities.
Vertiv has joined forces with Tecogen to provide advanced natural gas-powered chillers to data centres, addressing rising energy demands amid AI growth.
AVK appoints Wayne Searle as Chief People Officer to drive growth and sustainability in power solutions for UK and European data centres.
Vertiv has appointed Wei Shen as President of Greater China, effective 22 July 2025, bringing extensive leadership experience in power and infrastructure sectors.
Vertiv has launched three new CoolChip CDU models in EMEA, boosting liquid cooling options for high-density AI and HPC data centres with up to 600 kW capacity.
Vertiv will showcase AI-driven digital infrastructure and innovations at Datacloud Global Congress 2025, highlighting scalable, flexible data centre solutions.
Vertiv, NVIDIA and iGenius will deploy Colosseum, an AI supercomputer designed for regulated sectors, in southern Italy by 2025, advancing sovereign AI capabilities.